Posted on 02-04-2012
September
Bub Speedtrails 2012 Gallery
Links
Last day at Bonneville racing the Hammer
Last day off racing
August
Timing slips for the day
Entering the Slat Flats
Unpacking
Shipping out the boys
Shipping out the saltracers
Set back
July
Finishing up the gas/oil tank
Start up with blower and injection
Mounting up connections for the blower
First opstart
Avon high speed tire
"Knuckleheads"
Head job for high lift
June
How to install TJ5 blower cam.
Ready for paint ------ Back in black
Blower, pegs and brake line up
Leineweber
May
Iron Horse
Garage meeting with some salt
Garage meet
Mustang cut up..
April
Making the Heads ready for injection
Fitting rear wheel and tranny
Birthday
Pinstriping a mirror
Cut the head tube
Megasquirt simulator
March
Fitting 5 speed tranny in 4 speed frame
Workshop
On the rolling wheel
February
Dyna test Knuckle nr.2
Engine pickup at Bike Line
Løkken strand
Conan swap meet 2012
Quality Inn Stateline
January
Knuckleheads by W&W
Bonneville Salt Flats
Engine case
Workshop making plans
Hotrod T23
On the beach..
Chrismas
December
Bike Line Malmø
Our brand new crank case arrived.....
E-mail problems
Rotrex compressor
Megasquirt 1,0
November
WLC
Gone hunting
Bonneville pit in Copenhagen
Scandinavian Costum show
Before Scandinavian costum show
October
Cutting up the frame
Working at the rear end of the frame
Making plans for the frame
Well well well holiday is over....
Nice kitchen wall
Stockholm chopper
More new spareparts arrived to day
New spareparts
Beer meeting with Thomas from W&W
Problems with the clutch at WLC ..
where was he going ?
Even up in Greenland
Panhead 911
Saturday fun in the workshop ...
Fork
Salt racer
Wheels and harmoni
Sponsor from Norway
Cool garage scenes
motor accident
Engine..
Old school meet
Blog problems
Twin engine knucklehead dragstar
Bikes
Salt wheels
Working in garage
Route 46
Pearls on a string
Knuckle-head
Danish vincent viking team
Spareparts
Peters workshop
Conan swap meet 2011
Evil mother